Automating Delay Analysis:
A Smarter Way to Handle Concurrent Delays

According to a report by McKinsey, nearly 90% of large construction projects experience delays, with average cost overruns exceeding 20%. And, when multiple delays happen at once, some triggered by the contractor, a couple by the client, and some by third-party disruptions, leads to concurrent delays where determining liability becomes difficult.

Therefore concurrent delays are one of the most complex challenges in project delivery and claims management. During traditional forensic analysis methods, experts rely on manual scheduling reviews, fragmented site data, and expert interpretation, an approach that is time-consuming, subjective, and often results in arbitration.

However, things are changing with the advent of Artificial Intelligence. By combining construction domain expertise with advanced machine learning and natural language processing, companies like Masin are revolutionizing the way delay causation is identified, attributed and defended. Instead of weeks of manual effort, AI systems can now analyze thousands of documents, schedules, logs, and more in minutes, saving time, and offering accuracy.

In this article, we will talk about how automation is transforming delay analysis, especially in cases of concurrent delays, and why forward-thinking firms, like Masin, are adapting AI technology just as a tool but as a strategic advantage.

Concurrent Delay Analysis – What are the Complexities?

Concurrent delays refers to the situations where two or more delays, often caused by different parties, occur at the same time, impacting the date of completion of the project. In such cases, determining how to allocate responsibility is both technically and legally challenging.

Here are some of the common challenges associated with concurrent delays:

Subjectivity in Interpretation: With so many parties and experts involved, there could be different opinions and conclusions.
Data Overload: There are hundreds of schedules, logs, RFI, and correspondence. All this information needs to be analyzed before coming to the conclusion.
Methodological Debates: Various delay analysis methodologies exist (e.g., as-planned vs as-built, time impact analysis, and more), and the choice of method can significantly influence the outcome.
Delay Attribution: Evaluating and determining the causes, extent, impact of delay, and who is responsible for the delay.

What Automation in Concurrent Delays offer?

Automating delay analysis, particularly for concurrent delays, leverages technology to overcome these challenges. Experts can use powerful algorithms, machine learning, and data visualization tools to streamline the process, enhance accuracy, and provide actionable insights.
Here are some of the components of automation in delay analysis:

Document Parsing: AI-powered natural language processing (NLP) can extract relevant information from unstructured data sources like emails, meeting minutes, and change orders.
Standardization: Automated tools can help standardize data formats, ensuring consistency and reliability for analysis.
Critical Path Method (CPM) Automation: AI can help in identifying the critical path and its evolution throughout the project.
Baseline vs. As-Built Comparison: Experts can use AI tools to compare planned schedules with actual progress to pinpoint deviations and their timing.
Sophisticated Delay Analysis Methodologies: AI can use different methodologies like Automated Window Analysis, But-For Analysis, and more to access concurrent delays.
Automated Reports: AI can generate comprehensive delay analysis reports with supporting documentation, saving significant time in claim preparation and response.

Benefits of Automating Concurrent Delay Analysis:

Automating delay analysis, particularly with a focus on concurrent events, offers a wide range of benefits as compared to traditional methods. Some of them include:

Faster Turnaround Time: AI models can analyze thousands of records in minutes, compressing weeks of human efforts into hours.
Data-backed Objectivity: AI removes personal bias and subjectivity, presenting evidence-based findings that stand up in court or arbitration.
Stronger Claims Preparation: AI can identify and organize data clearly, strengthening both defensive and offensive claims.
Resource Efficiency: While AI can work on data, human experts can focus on strategy, legal reasoning, and negotiation, saving a lot of time and effort.
Improved Cost Efficiency: With reduced hours of labor, comes the reduced billable time for clients. And, reduced cost without any compromise on quality.

Implementing AI-Driven Analysis in Concurrent Delays:

Implementing automated delay analysis requires a blend of the right technology, clean data, and organizational alignment. Companies like Masin have mastered the art of implementing AI-driven analysis in concurrent delays to provide effective results. Here is how to implement for delay analysis:

Data Preparation: First step is to ensure access to quality input data – baseline schedules, daily logs, weather data, RFIs, meeting notes, and more.
Human-AI Collaboration: AI delivers the first draft of delay insights, whereas human experts validate, interpret, and draft strategies to act on them.
Continuous Learning: Feedback loops train the models to continuously improve accuracy over time.

Implementing Automation: Challenges and Considerations:

While the benefits are clear, implementing automated delay analysis is not without its challenges. Here are some of the challenges:

Garbage in, Garbage out: Poor quality or missing data limits the usefulness of AI outputs.
Over-Reliance on Technology: AI offers suggestions, not conclusions. This is why human validation becomes crucial.

Adoption Resistance: Teams may be slow to trust or integrate new tech.
Understanding Methodologies: Automated tools need to be configured to apply accepted delay analysis methodologies correctly, and users must understand the underlying principles.
Initial Investment: Acquiring and implementing sophisticated software and training personnel requires an upfront investment.
Legal Acceptance: While automation provides robust data, the legal acceptance of specific automated analysis outputs in courts or arbitration tribunals is an evolving area.
Masin AI’s Intelligent Framework:

Masin is at the forefront of AI-powered claims and dispute resolution in the construction sector. The company has built intelligent tools that blend domain knowledge with the power of AI, enabling smarter and faster delay analysis.

This is what sets Masin AI apart from its counterparts:

Quick Insights: Masin AI’s tool can engage in intelligent, context-aware conversations to provide quick insights. Whether analysing claims, interpreting legal clauses, or navigating arbitration complexities, Masin AI can provide precise, domain-specific guidance to streamline decision-making.

Vast Knowledge Base: It provides a comprehensive repository of legal frameworks, case precedents, and contract best practices. Designed for construction and engineering professionals, it delivers well-researched insights, ensuring informed decision-making across contract management, claims, and risk assessment.

Expert Crafted Prompts: Accelerate contract analysis and dispute resolution with structured prompts designed by industry experts. Whether crafting claims, reviewing legal documents, or responding to contractual queries, the tool equips you with ready-to-use, AI-optimized inputs that enhance accuracy and efficiency.

Structured Reports in Legal-ready Formats: Generate precise, structural reports in legal-ready formats. Ensure Compliance with tribunal standards by creating meticulously formatted legal documents with robust citations.

The Future of Delay Analysis:

The future of delay analysis is undeniably digital. As AI and machine learning continue to advance, we can expect even more sophisticated tools that not only analyze delays but also provide prescriptive recommendations for mitigation, simulate complex scenarios with greater accuracy, and even assist in predicting the likely outcome of disputes based on historical legal precedents.
Automating delay analysis is more than just a technological upgrade; it represents a fundamental shift in how construction projects manage risk, resolve disputes, and ultimately deliver successful outcomes. By embracing these smarter methods, the industry can move away from reactive, contentious battles over delays and towards a proactive, data-driven approach that fosters collaboration and ensures projects stay on track, even in the face of concurrent complexities. This transformation is essential for the continued growth and efficiency of the global construction sector.
Conclusion:
Concurrent delays will always remain a legal and technical grey area, but how we analyse them is evolving rapidly. Masin AI represents a leap forward in forensic analysis, using machine learning and contract-aware automation to take the guesswork out of delay attribution. Faster, more accurate, and more objective—AI isn’t replacing the expert; it’s making the expert smarter.
For construction firms, legal consultants, and arbitration professionals, now is the time to embrace AI-driven delay analysis—not as a luxury, but as a strategic necessity. Explore Masin AI’s capabilities or request a demo to see how your data can yield powerful, dispute-ready insights.